Kuinka kauan sovelluksen kehittäminen ideasta julkaisuun kestää?
Vertics
· Reading time 6 min
Building a new digital service almost always raises the question of schedule. When a clear idea is born, the desire to get the finished product to market and to end users is strong. Rushing without a clear plan, however, often leads to code having to be fixed on the fly. This delays the release even further. Successful app development therefore always requires a balance between quality and speed.
The length of a project is made up of precisely defined phases, the chosen technology architecture and the scope of the integrations required. A practical, realistic approach helps avoid unrealistic expectations. It ensures that the product is ready in the time that makes sense for the business, without compromising on quality. Projects of different scope fall into time spans of different length, and certain key factors determine how fast the project ultimately progresses.
How long does app development take?
The length of a software project depends directly on its scope and complexity. Projects can be divided into three clear categories, each with its own typical time span. In each category, the amount of work and the resources required differ significantly.
1. Lightweight MVP (Minimum Viable Product): 3 to 4 months
The purpose of an MVP is to bring the core promise of the service to market as quickly as possible. In development, everything extra is cut. The focus is only on the functions that solve the user's main problem. Building a lightweight app this way typically takes 3 to 4 months. It lets you collect feedback from real users quickly without large financial risks.
2. Custom service: 5 to 8 months
When the app needs a wider range of features, you move to a medium-sized app project. These include personalised user profiles, messaging features, payment systems and a custom admin panel with a back end. Such a development project typically takes 5 to 8 months. That leaves time to refine the details of the user interface and make sure the system scales.
3. Large system with integrations: 9+ months
Large enterprise systems need a development time of at least nine months. They often require complex integrations with legacy ERP or CRM systems, a high level of security and real-time data processing. In these projects, a significant share of the time goes into mapping existing interfaces, testing and making sure the system is secure.
Practical experience shows that staying on schedule above all requires the ability to prioritise. Take a closer look at our mobile app development services and see how different projects are built in practice.
How development phases and technology choices affect the length of the project
Two factors decisively affect software development time: how the project phases are managed and the chosen technology architecture. A professionally run project always consists of specification, UI/UX design, coding, and quality assurance and testing. Skipping even one phase comes back later as a cycle of fixes, which lengthens the overall project considerably.
The single biggest decision for the length of the development phase is the choice between native development and cross-platform technologies. In native development, the iOS and Android apps are built as separate projects in their own programming languages, such as Swift and Kotlin. This model requires writing two separate code bases and keeping the teams constantly in sync. It often doubles the amount of work required and lengthens development time considerably.
With modern cross-platform technologies such as React Native or Flutter, the app is coded only once. It works very well on both Apple and Android devices. Maintaining a shared code base is efficient, because new features and fixes are made in one place only. At best, this choice can halve the length of the coding phase, so the app reaches users faster and at lower cost.
Flutter
Cross-platform
Choosing the right architectural solutions at the very start saves working hours and makes the app easy to develop further in the future. Learn more about our practical way of working in our new software development expert services.
How is an app released on the App Store and Google Play?
Once the code is finished and tested, a decisive phase begins: making the product available to users through the official app stores. The release process requires technical precision and preparation for the stores' own approval procedures. Many projects run into delays right at the finish line because the time a release takes and the stores' stricter requirements were not taken into account in the project plan.
The App Store (Apple) and Google Play (Google) review every new app before approving it for distribution. Apple's review process is known to be thorough. It typically takes around 24 to 48 hours, but any issues found can push the release back by days or weeks. On Google Play, the requirements have become even stricter. New personal Google Play Console developer accounts in particular are now required to run extensive closed testing, in which at least 20 independent testers must use the app continuously for 14 days before public distribution can be requested.
The most common reasons for a delayed release:
- Missing test credentials: Reviewers must have unrestricted access to every part of the app. If working test credentials are not provided for a service that requires login, the submission is rejected immediately.
- Inadequate privacy practices: The app stores require a comprehensive privacy policy to be linked directly on the store page and inside the app, to make the handling of user data transparent.
- Technical instability: If the app crashes on the reviewer's device or its main function does not match the description provided, the app is returned for fixing.
A smooth release is ensured by going through the store requirements at the very start of development. Preparing the technical side and materials such as screenshots and marketing texts in good time saves valuable time in release week.
What does app maintenance cost after release?
Launch day starts a new life cycle for the app, so development does not end at release. Digital services need ongoing care to stay reliable, secure and compatible with new devices. According to common expert estimates in the software industry, a realistic budget for an app's annual maintenance is about 15 to 20 % of its original development costs.
The need for maintenance comes from several factors, the most significant of which is the fast development cycle of operating systems. Both Apple and Google release major operating system updates every year. The updates bring new security requirements as well as changes to permissions and system-level interfaces. Without regular compatibility testing and management of technical debt, the app may be disrupted or stop working altogether on new phone models.
Another significant cost item is back-end systems and server costs. As the number of active users grows, back-end systems and databases also need more capacity. In addition, services and APIs provided by third parties, such as payment processing, map services or SMS authentication, may become paid services or require technical updates. Regular maintenance ensures that these important integrations work without interruption and that the end user experience stays good.
Resources put into maintenance are an investment rather than a cost. They protect the original software project and ensure the continuity of the service far into the future.
How to choose the right partner to keep schedules and budget under control
Successful app development requires a partner that can steer the project in a practical, business-driven way. Often the biggest challenge in software projects is not writing code but managing scope. You can recognise the right partner by their willingness to challenge your original ideas and suggest simpler solutions in place of complex ones. This is especially important when the goal is to build a first market version, an MVP.
A good software house relies on agile methods (Agile/Scrum). Development is done in short cycles, and progress is reviewed regularly together with the client. Managing an open task list (backlog) and transparent communication make sure you know exactly where the hours go and which features are being built right now. More important than the lowest hourly rate is to look at the developers' experience, the chosen technologies and the ability to communicate clearly without vague technical jargon.
Strict prioritisation and MVP thinking protect the budget effectively from overruns. When the project scope is kept under control and features are added only on the basis of real user feedback, you avoid unnecessary work. This prevents situations where expensive features are built that turn out not to be needed after all.
Design
Let's design your app smartly
We offer a practical, risk-free specification workshop in which we map the technical requirements of your app idea and create a realistic, phased project plan with a schedule and budget. Get in touch with Vertics' experts and we will get your project started smoothly and reliably.
Realistic scheduling, the right technology choices and a clear understanding of future maintenance needs create a strong foundation for a software project. Starting with a lightweight scope and choosing a business-driven partner ensure that the app is finished on time and on budget. The journey from idea to finished product requires close collaboration and continuous learning. Done right, however, it opens up entirely new opportunities for business growth.
Frequently asked questions (FAQ)
How long does building an app usually take?
Development time depends on the scope of the app: a lightweight MVP is ready in 3 to 4 months, a custom service in 5 to 8 months, and a large system takes more than 9 months.
How can the coding phase be shortened?
With cross-platform technologies such as React Native or Flutter, the coding phase can be cut by about 50 % compared with separate native development.
How long does it take to get an app approved in the app stores?
Apple's App Store review typically takes 24 to 48 hours. On Google Play, a new developer account may require 14 days of closed testing with at least 20 testers before release.
Why can a release in the app store be delayed?
The most common reasons are missing test credentials for reviewers, gaps in the privacy policy, or technical instability and crashes in the app.
How much should you budget for app maintenance?
It is advisable to budget about 15 to 20 % of the app's original development costs for annual maintenance.
How do you keep an app project's budget under control?
The budget is protected through strict prioritisation, agile methods (Agile/Scrum) and by starting with a lightweight MVP.
Related service Software development. Tell us what you need.
Tell us what you needMore on the blog
Ask us
Atte PohjanmaaCEO, Board member
atte@vertics.co
044 282 0291
Timo MoilanenOperating Partner, Board member
timo@vertics.co
050 363 7323